ABOUT EON FREE ZONE PHASE II 

ABOUT EON FREE ZONE PHASE II

With EON Free Zone Phase I's success, there was a consequent increase in demand for similarly creative and modern offices. Owing to this demand, the development of Phase II was set in motion. A thematic conjunct between both phases led to a similar design ideology for Phase I and Phase II. These ideologies created workspace elements that encourage collaboration, lateral thinking, and a dynamic environment that supports increasing growth and achievement levels.

EON Free Zone Phase II has clean lines and increased elevation as part of its structure, fitted with state-of-the-art facilities and amenities. EON Free Zone Phase II is a recipient of a Covid-19 assurance statement from the prestigious British Safety Council.

PROJECT SUMMARY

Name EON Free Zone II
Location S.no. 72, Kharadi, Pune
Campus Spread 12 Acres
Total Development Size 2.2 million sq. ft.
Type IT & IT- eS specific SEZ
Development Parcel 2 Towers
Levels 5 Parking levels + 16 Office floors
Typical Floor Plate ~ 71,426 sq. ft.

 

 

TECHNICAL SPECIFICATIONS

Structure & Finishes Composite aluminium panels & Double glazed low E glazing
Typical Floor Height 3.9 mts.
Column Grid 8.4 mts. x 8.4 mts.
Elevators 24 nos. DCS (Destination Control System) elevators / each tower
Electrical Provision 100% DG power back-up Connected
Load 1.25 KVA / 100 sq. ft. of carpet area
Floor Loading Typical areas-400 kg/sq. mts. Critical areas-1000 kg/sq. mts.
Service Core Centralized service core, which accommodates 2 pantries, 4 sets of male & female washrooms, 2 executive & 2 specially-abled washrooms, janitor rooms and electrical rooms
Air-conditioning Designed to accommodate VRF system of air-conditioning
Telecom Right-of-way to all operators (existing operators include TATA Communications, Vodafone, Airtel, Idea Cellular, Reliance, and many more)
Parking Abundant parking provision within B1, B2, B3, Ground and Podium

CLIENTELE

Allianz

allscripts

Citigroup

Citco

CompuCom Systems

credit-suisse

Cybage

isobar

lt-infotech

Mphasis

northern-trust

Synechron

ubs

xpo

zensar

BUSINESS SUPPORT SERVICES

Crèche On transfer lobby level of Tower A.
Training Rooms 2 nos. (~25 seater & ~35 seater) with pre-function area on transfer lobby level within Tower A
  4 nos. (Two ~25 seater & Two ~35 seater) with pre-function area on transfer lobby level within Tower B
Auditoriums 2 nos. (~75 seats each) with pre-function area on B2 Level within Tower A.
  2 nos. (~75 seats each) with pre-function area on Ground Level within Tower B.
Common Food Court A common multi-cuisine food court spread over approx. 75,000 sq. ft. area within the Gr + Level 1 of the recreation block.
Health club A state-of-the-art health club by ABS Fitness with robust facilities on level 2 of the recreation block.

FOOD COURT SUPPORT SERVICES

  • Common multi-cuisine food court area: ~ 75,000 sq. ft. on Level 1, 2 & 3 of the recreation block
  • Seating capacity : ~ 1800 seats across both levels of the food court
  • Total number of outlets : ~ 20
  • Open coffee shop (Starbucks) with external sit-outs on the landscaped podium

FLOOR PLANS

Typical Floor Plan

Second Floor Plan

7th, 11th and 15th Floors plan